Spain · Europe Engineering and workshop in Ortuella, Bizkaia
Guides

What you should know before automating.

Straight answers to what we are asked before the first visit: price, lead times, what can be reused on the line and what we need from you.

G.01

How much does a robotic cell cost?

Where the money goes, what drives the cost up and what we need to give you a figure.

Read the guide →
G.02

Stacking or racking at the end of a press line: how to choose

When each solution pays off and what to look at on the line.

Read the guide →
G.03

Replacing the robots on a line already in production

What is reused, what is replaced and how to fit it into the shutdown.

Read the guide →
G.04

3D vision for inspecting stamped parts

Which defects are detected, at what speed and how it integrates with the line.

Read the guide →
G.05

What to prepare before requesting a cell

The information that shortens the quotation and avoids surprises during commissioning.

Read the guide →
G.06

Digital twin and MES connection: what you gain on the shop floor

The cell in 3D with its real status, and production data in the plant system.

Read the guide →

How quickly will your cell pay for itself?

A first estimate in one minute, based on your shifts and hourly cost.

Calculate payback →
Contact Newsletter